Skip to main contentSkip to main navigationSkip to footer content

Contact Us

Measure Q Contact

Fairfield Campus
4000 Suisun Valley Road
Buidling 1102

Measure Q Bonds Program Management Team (Kitchell)
Priscilla Meckley, Program Director, Phone (707) 863-7870

Noe Ramos, Sr. Project Manager, Phone (707)863-7826

Sandy Su, Fiscal Controls Manager, Phone (707)864-5858

Christy Pinney, Project Engineer II (707)864-7189

Lisa Dixon, Field Office Manager, Phone (707)864-7189

Tony Velasco, Sr. Project Manager (916)347-8396

Andrew Gleeson, Project Manager, (916)342–7965


Priscilla.Meckley@Solano.edu
(707)864-7189

Bidding Opporunities

 

 

Notice to all Contractors DIR Registration Requirement Instructions

 

General Contractors 

03/07/25 Invitation to Bid PDF

03/06/25 Pre-Bid Conference - Sign-In Sheet PDF
02/26/25 Project Drawings (DSA Approved)  
02/26/25 Project Manual   
02/26/25 Reference Document – FF Utilities Map  
02/26/25 Frequently Asked Questions (FAQ)  
02/26/25 Invitation to Bid  

02/20/25 Bid Tally   PDF
02/17/25 Addendum #1  
01/31/25 Sign-In Sheet  
01/22/25 Project Photos  
01/22/25 JM Roof Warranty   
01/22/25 Record Drawings     
01/22/25 Project Drawings (DSA Approved)    
01/22/25 Project Manual   
01/22/25 Frequently Asked Questions (FAQ)   
01/22/25 Invitation to Bid  

 

Closed

11/20/24 Bid Tally  PDF
11/14/24 Addendum #2  
11/08/24 Project Photos  
11/08/24 JM Roof Warranty  
11/06/24 Sign-In Sheet  
10/31/24 Addendum #1  
 10/30/24 Technical Specifications   
 10/30/24 Record Drawings    
 10/30/24 Project Drawings (DSA Approved)    
 10/30/24 Project Manual   
 10/30/24 Frequently Asked Questions (FAQ)   
 10/30/24 Invitation to Bid  

12/19/24 Bid Tally  PDF
12/13/24 Prequalification Results  
12/06/24 FF Campus Map  
12/06/24 Addendum #6  
11/20/24 Addendum #5  
10/31/24 Sign-In Sheet: Site Visit  
10/30/24 Sign-In Sheet: Pre-Bid Conference  
10/30/24 Pre-Bid Conference Registration Link   
10/16/24 Addendum #4  
10/16/24 Project Manual  
10/16/24 Addendum #4 (Conform Project Drawings)  
10/16/24 Addendum #4 (Conform Technical Specs)  
10/16/24 Reference Document – FF Utilities Map  
10/16/24 Frequently Asked Questions (FAQ)  
10/16/24 Invitation to Bid  
10/16/24 Addendum #3 (Original Bid Document)  
10/16/24 Addendum #2 (Original Bid Document)  
10/16/24 Addendum #1 (Original Bid Document)  
10/16/24 DSA Approved Form 103 (Original Bid Document)  
10/16/24 DSA Approved Project Drawings (Original Bid Document)  
10/16/24 Project Manual (Original Bid Document)  

12/13/24 Project Manual (Original Bid Document) PDF
11/12/24 Addendum #1  
9/27/24 Notice to Prospective Prime Contractors to Prequalify  
9/27/24 Prequalification Information for Prospective Bidders & Prequalification Questionnaire  
9/27/24 Prime Contractor Prequalification Evaluation Procedure  

9/19/24 Bid Tally PDF
08/30/24 Sign-In Sheet  
08/22/24 Project Drawings  
08/22/24 Project Manual  
08/22/24 Invitation to Bid  
08/29/24 EMT Nursing Addendum 01  
08/29/24 EMT Nursing Addendum 02  

08/01/24 Bid Tally Results PDF
07/23/24 Addendum #1  
07/16/24 Sign-In Sheet  
06/26/24 As Built Drawings  
06/26/24 Utilities Map  
06/26/24 Technical Specifications  
06/26/24 Project Drawings (DSA Approved)  
06/26/24 Project Manual  
06/26/24 Frequently Asked Questions (FAQ)  
06/26/24 Invitation to Bid  

07/03/24 Bid Tally Results PDF
06/28/24 Addendum #1  
06/20/24 Pre-Bid Job Walk Sign-In Sheet  
06/18/24 Pre-Bid Job Walk Map  
06/12/24 Project Drawings (DSA Approved)  
06/12/24 Project Manual  
06/12/24 Frequently Asked Questions (FAQ)  
06/12/24 Invitation to Bid  

07/25/24 Bid Tally Results PDF
07/22/24 Addendum #3  
07/12/24 Addendum #2  
07/02/24 Addendum #1  
06/18/24 Pre-Bid Site Visit Sign-In Sheet  
06/05/24 Reference Document – FF Utilities Map  
06/05/24 DSA Form 103 (DSA Approved)  
06/05/24 Project Drawings (DSA Approved)  
06/05/24 Project Manual  
06/05/24 Frequently Asked Questions (FAQ)  
06/05/24 Invitation to Bid  

07/03/24 Bid Tally Results PDF
06/21/24 Addendum #1  
06/10/24 Pre-Bid Site Visit Sign-In Sheet  
06/06/24 Sign-In Sheet  
05/29/24 Equipment Line Drawings  
05/29/24 Area of Work Drawings  
05/29/24 Project Manual  
05/29/24 Technical Specifications  
05/29/24 Frequently Asked Questions (FAQ)  
05/29/24 Invitation to Bid  

06/27/24 Bid Tally Results PDF
06/21/24 Addendum #1  
06/10/24 Pre-Bid Site Visit Sign-In Sheet  
06/06/24 Sign-In Sheet  
05/29/24 Roof Asbestos Survey  
05/29/24 Existing Site Photos  
05/29/24 Project Drawings  
05/29/24 Project Manual  
05/29/24 Frequently Asked Questions (FAQ)  
05/29/24 Invitation to Bid  

04/17/24 Bid Tally Results PDF
04/11/24 Addendum #1  
03/27/24 Sign-In Sheet  
03/13/24 Reference Document – FF Utilities Map  
03/13/24 Reference Document – Geotechnical Report  
03/13/24 Reference Document – AsBuilt Capped Gas Line  
03/13/24 Project Drawings (DSA Approved)  
03/13/24 DSA Form 103 (DSA Approved)  
03/13/24 Technical Specifications (DSA Submittal)  
03/13/24 Project Manual  
03/13/24 Frequently Asked Questions (FAQ)  
03/13/24 Invitation to Bid  

05/01/24 Bid Tally Results PDF
04/24/24 Addendum #4 (DSA Approved Documents)  
04/11/24 Addendum #3  
03/25/24 Sign-In Sheet  
03/22/24 Addendum #2  
03/21/24 Sign-In Sheet  
03/18/24 Addendum #1  
03/06/24 Project Drawings  
03/06/24 Project Manual  
03/06/24 Frequently Asked Questions (FAQ)  
03/06/24 Invitation to Bid  

04/04/24 Bid Tally Results PDF
03/13/24 Sign-In Sheet  
02/28/24 Invitation to Bid  
02/28/24 Project Manual  
02/28/24 Technical Specifications  
02/28/24 Drawings  
02/28/24 Frequently Asked Questions  

03/15/24 Bid Tally Results PDF
03/07/24 Addendum #6  
02/22/24 Sign-In Sheet  
02/14/24 Addendum #5  
02/14/24 Addendum #4 – Revised Hazmat Specifications  
02/14/24 Addendum #4 – Revised Project Manual  
02/14/24 Addendum #4 – Cover Sheet  
02/14/24 Reference Document – FF Utilities Map  
02/14/24 Frequently Asked Questions (FAQ)  
02/14/24 Invitation to Bid  
04/26/23 Addendum #3 (Original Bid Document)  
04/19/23 Addendum #2 (Original Bid Document)  
03/27/23 Addendum #1 (Original Bid Document)  
02/22/23 DSA Approved Form 103 (Original Bid Document)  
02/22/23 DSA Approved Project Drawings (Original Bid Document)  
02/22/23 Project Manual (Original Bid Document)  

02/21/24 Bid Tally Results PDF
02/16/24 Addendum #1  
02/09/24 Sign-In Sheet  
01/31/24 Reference Documents  
01/31/24 DSA Form 103  
01/31/24 Project Drawings  
01/31/24 Project Manual  
01/31/24 Frequently Asked Questions  
01/31/24 Invitation to Bid  

12/21/23 Bid Tally Results PDF
12/15/23 Addendum #4  
12/11/23 Addendum #3  
11/29/23 Mandatory Pre-Bid Meeting Sign-In Sheet  
11/22/23 Addendum #2  
11/16/23 Addendum #1  
11/08/23 Project Specifications  
11/08/23 Frequently Asked Questions  
11/08/23 Project Drawings  
11/08/23 Project Manual  
11/08/23 Invitation to Bid  

12/07/23 Bid Tally Results PDF
11/15/23 Addendum # 3  
11/13/23 Addendum # 2  
11/03/23 Addendum # 1  
11/02/23 Mandatory Pre-Bid Meeting Sign-In Sheet  
10/25/23 Frequently Asked Questions  
10/25/23 Project Drawings  
10/25/23 Project Manual  
10/25/23 Invitation to Bid  

10/26/23 Bid Tally Results PDF
10/18/23 Addendum #3  
10/13/23 Addendum #2  
09/22/23 Addendum #1  
09/20/23 Frequently Asked Questions  
09/20/23 DSA Form 103  
09/20/23 Project Drawings  
09/20/23 Project Manual  
09/20/23 Invitation to Bid  

06/08/23 Sign-in Sheet PDF
06/08/23 Pre-Bid Presentation  
05/31/23 Utilities Map  
05/31/23 Invitation to Bid  
05/31/23 Frequently Asked Questions (FAQ)  
05/31/23 Project Manual  
05/31/23 Project Drawings  

09/29/22 Bid Tally Results PDF
09/12/22 Mandatory Pre-Bid Meeting Presentation  
09/12/22 Mandatory Pre-Bid Meeting Sign-In Sheet  
08/24/22 Project Specifications  
08/24/22 DSA Required Inspections  
08/24/22 Frequently Asked Questions  
08/24/22 Project Drawings  
08/24/22 Project Manual  
08/24/22 Invitation to Bid  

09/29/22 Bid Tally Results PDF
09/23/22 Addendum #3  
09/20/22 Addendum #2  
09/09/22 Addendum #1  
09/01/22 Mandatory Pre-Bid Meeting Presentation  
09/01/22 Mandatory Pre-Bid Meeting Sign-In Sheet  
08/24/22 Reference Documents  
08/24/22 DSA Form 103  
08/24/22 Frequently Asked Questions  
08/24/22 Project Drawings  
08/24/22 Project Manual  
08/24/22 Invitation to Bid  

09/21/22 Addendum #4 PDF
09/07/22 Addendum #3  
09/02/22 Addendum #2  
08/29/22 Mandatory Pre-Bid Meeting Presentation  
08/29/22 Mandatory Pre-Bid Meeting Sign-In Sheet  
08/17/22 Addendum #1  
08/17/22 Frequently Asked Questions  
08/17/22 Required Submission Forms  
08/17/22 Pricing Proposal  
08/17/22 Contract Terms & Requirements  
08/17/22 Technical Overview Documents  
08/17/22 Qualifications Questionnaire  
08/17/22 RFQ/P Packet  
08/17/22 Invitation to Bid  

04/25/24 Bid Tally Results PDF
04/17/24 Addendum 004  
04/11/24 Addendum 003  
03/27/24 Addendum 002  
03/21/24 Addendum 001  
03/07/24 Mandatory Pre-Bid Meeting Presentation  
03/07/24 Mandatory Pre-Bid Meeting Sign-In Sheet  
02/28/24 Invitation to Bid  
02/28/24 Drawings  
02/28/24 Project Manual   

04/27/23 Addendum 003 PDF
04/20/23 Addendum 002  
04/10/23 Mandatory In-Person Site Visit Sign-In Sheet  
04/05/23 Sign-in Sheet  
04/05/23 Pre-Bid Presentation  
03/27/23 Addendum 001  
03/22/23 Invitation to Bid  
03/22/23 Frequently Asked Questions (FAQ)  
03/22/23 Project Manual  
03/22/23 Project Drawings  
03/22/23 DSA 103 Form  
03/22/23 Reference Documents  

03/09/23 Addendum 003 PDF
02/17/23 Addendum 002  
02/16/23 Mandatory Pre-Bid Meeting Presentation  
02/16/23 Mandatory Pre-Bid Meeting Sign-In Sheet  
02/08/23 Addendum 001  
02/08/23 Addendum 001 Document DSA Approved Project Manual  
02/08/23 Addendum 001 Document DSA Approved Drawings  
02/08/23 Addendum 001 Document DSA Approved Form 103  
02/01/23 Invitation to Bid  
02/01/23 Frequently Asked Questions (FAQ)  
02/01/23 Project Manual  
02/01/23 Project Drawings  
02/01/23 Reference Documents  

04/20/23 Bid Tally Results PDF
04/12/23 Addendum 004  
04/06/23 Addendum 003  
03/29/23 Addendum 002  
03/16/23 Mandatory Pre-Bid Presentation  
03/16/23 Mandatory Sign-In Sheet  
03/01/23 Addendum 001  
03/01/23 Invitation to Bid  
03/01/23 Frequently Asked Questions (FAQ)  
03/01/23 Project Manual  
03/01/23 Project Drawings  
03/01/23 DSA 103 Form  
03/01/23 Reference Documents  

08/11/22 Bid Tally Results PDF
08/11/22 Live Bid Stream  
08/01/22 Addendum #3  
07/28/22 Addendum #2  
07/19/22 Addendum #1  
07/15/22 Mandatory Pre-Bid Meeting Presentation  
07/15/22 Mandatory Pre-Bid Meeting Sign-In Sheet  
07/06/22 Frequently Asked Questions  
07/06/22 Project Drawings  
07/06/22 Project Manual  
07/06/22 Invitation to Bid  

04/15/22 Addendum #1 PDF
04/01/22 Mandatory Pre-Bid Meeting Sign-In Sheet  
03/21/22 Project Specifications  
03/18/22 Project Drawings  
04/21/22 Live Bid Stream  
04/21/22 Bid Tally Results  
03/18/22 Invitation to Bid  

04/01/22 Bid Tally Results PDF
03/24/22 Addendum #3  
03/11/22 Mandatory Virtual Pre-Bid Meeting Sign-In Sheet  
03/15/22 Addendum #2  
03/07/22 Addendum #1  
03/02/22 Reference Documents  
03/02/22 Frequently Asked Questions  
03/02/22 Project Drawings  
03/02/22 Project Manual  
03/02/22 Invitation to Bid  

10/29/21 Link to RFQ/P Document PDF
10/29/21 Invitation to Bid  

 

 

Archived General Contractor Projects

11/18/21 Bid Tally Results PDF
10/28/21 Mandatory Pre-Bid Meeting Presentation  
10/28/21 Mandatory Virtual Pre-Bid Meeting Sign-In Sheet  
11/01/21 Addendum #2  
10/20/21 Addendum #1  
10/15/21 Reference Document - Utilities Map  
10/15/21 Frequently Asked Questions  
10/15/21 Project Drawings  
10/15/21 Project Specifications  
10/15/21 Invitation to Bid  

08/05/21 Bid Tally Results PDF
07/29/21 Addendum #3  
07/16/21 Addendum #2  
07/15/21 Mandatory Pre-Bid Meeting Presentation  
07/15/21 Mandatory Virtual Pre-Bid Meeting Sign-In Sheet  
07/12/21 Addendum #1  
07/07/21 Reference Document  
07/07/21 Frequently Asked Questions  
07/07/21 Project Drawings  
07/07/21 Project Specifications  
07/07/21 Invitation to Bid  

05/13/21 Bid Tally Results PDF
05/05/21 Addendum #1  
04/23/21 Mandatory Pre-Bid Meeting Presentation  
04/23/21 Mandatory Virtual Pre-Bid Meeting Sign-In Sheet  
04/14/21 Project Drawings  
04/14/21 Project Specifications  
04/14/21 Invitation to Bid  

04/16/21 Bid Tally Results PDF
04/05/21 Addendum #2  
03/30/21 Addendum #1  
03/25/21 Mandatory Pre-Bid Meeting Presentation  
03/25/21 Mandatory Virtual Pre-Bid Meeting Sign-In Sheet  
03/17/21 Project Drawings  
03/17/21 Project Specifications  
03/17/21 Frequently Asked Questions  
03/17/21 Invitation to Bid  

03/23/21 Bid Tally Results PDF
03/17/21 Addendum #2  
03/10/21 Addendum #1  
03/08/21 Mandatory Pre-Bid Meeting Presentation  
03/08/21 Mandatory Pre-Bid Meeting Sign-In Sheet  
02/26/21 Project Drawings  
02/26/21 Project Specifications  
02/26/21 Invitation to Bid  

09/02/20 Bid Tally Results PDF
08/12/20 Addendum #3 and Addendum #4  
07/29/20 Attendance Roster and Informal Sign-In Sheet  
07/29/20 Pre-Bid Conference Presentation  
07/24/20 Addendum #2  
07/16/20 Addendum #1  
07/16/20 Irrigation Plan  
07/16/20 Fairfield Utilities Map  
07/16/20 DSA Form 103  
07/16/20 Project Drawings  
07/16/20 Project Specifications  
07/16/20 Frequently Asked Questions  
07/16/20 Invitation to Bid  

03/09/20 Bid Tally Results PDF
03/04/20 As Built Drawings  
03/04/20 REVISED Project Drawings-Addendum # 1  
03/04/20 Addendum #1  
02/25/20 Pre-Bid Meeting Sign-In Sheet  
02/12/20 Fairfield Campus Underground Utility Map  
02/12/20 Project Drawings-See REVISED Project Drawings-Addendum # 1  
02/12/20 Project Specifications  
02/12/20 Frequently Asked Questions  
02/12/20 Invitation to Bid  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
Archived Professional Services Projects

Ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet. Lorem sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua.illum dolore eu feugiat nulla facilisis at vero eros et accumsan et iusto odio dignissim qui

Heading 3

You can enter content freely. for an accordion panel.

When heading is empty, the panel does not output.

Even when you skip a row, you want to go off by the number indicated in the heading column when you are setting a specific panel to open on load.