Skip to main contentSkip to main navigationSkip to footer content

Contact Us

Measure Q Contact

Fairfield Campus
4000 Suisun Valley Road
Buidling 1102

Measure Q Bonds Program Management Team (Kitchell)
Priscilla Meckley, Program Director, Phone (707) 863-7870

Noe Ramos, Sr. Project Manager, Phone (707)863-7826

Sandy Su, Fiscal Controls Manager, Phone (707)864-5858

Christy Pinney, Project Engineer II (707)864-7189

Lisa Dixon, Field Office Manager, Phone (707)864-7189

Tony Velasco, Sr. Project Manager (916)347-8396

Andrew Gleeson, Project Manager, (916)342–7965


Priscilla.Meckley@Solano.edu
(707)864-7189

Approved Contracts

 

Title Content
BOT Meeting 9/3/2025
BOT Meeting 8/20/2025
BOT Meeting 8/6/2025
BOT Meeting 7/16/2025
  • Notice of Completion for Construction Services for the Campus-Wide Interior Refresh (Phase 1B) Project
  • Notice of Completion for Construction Services for the Early Learning Center Walkway Project
  • Contract Award to the KYA Group for Construction Services for the Fairfield Baseball Field Drainage Improvement Project
  • Contract Amendment #1 to PMP Environmental Consulting, Inc. for Additional Services for the Building 1600 Modernization Project
  • Contract Amendment #3 to Geocon Consultants, Inc. for the Fairfield Campus Substations #3 & #4 Replacement Project
  • Contract Amendment #4 to Aedis Architects for Additional Professional Services for the Building 1600 Modernization Project
  • Ratification of Contract Award to Arthulia, Inc. for Construction of the Fairfield Campus Sand Volleyball Courts Project
  • Change Order #2 to Concentric Concrete, Inc. for Construction Services for Fairfield Campus Early Learning Center Walkway Project
BOT Meeting 6/18/2025
BOT Meeting 6/4/2025  
BOT Meeting 5/21/2025
BOT Meeting 5/7/2025
BOT Meeting 4/16/2025
BOT Meeting 4/2/2025  
BOT Meeting 3/19/2025

 

Title Content
BOT Meeting 3/5/2025
BOT Meeting 2/19/2025
BOT Meeting 2/5/2025
BOT Meeting 1/15/2025

Title Content
BOT Meeting 12/8/2024
BOT Meeting 12/4/2024
BOT Meeting 11/20/2024
BOT Meeting 11/6/2024
BOT Meeting 10/16/2024
BOT Meeting 10/2/2024
  • Contract Award to Construction West Services, Inc. for Construction Services for the Building 800 EMT and Nursing Renovation Project
  • Contract Amendment #1 to Salas O’Brien for Additional Professional Services for the Central Plant Replacement Project
  • Change Order #1 to Schreder & Brandt Mfg., Inc. for the Fairfield Campus Quad Water Conservation Project
BOT Meeting 9/18/2024
BOT Meeting 8/21/2024
BOT Meeting 8/7/2024
BOT Meeting 7/17/2024
BOT Meeting 6/5/2024
BOT Meeting 5/15/2024
BOT Meeting 5/1/2024
BOT Meeting 4/17/2024
BOT Meeting 4/3/2024
BOT Meeting 3/20/2024
BOT Meeting 3/6/2024
BOT Meeting 2/21/2024
BOT Meeting 2/7/2024
BOT Meeting 1/17/2024

BOT Meeting 12/20/2023
BOT Meeting 12/6/2023
BOT Meeting 11/15/2023
BOT Meeting 11/1/2023
BOT Meeting 10/19/2023
BOT Meeting 10/4/2023
BOT Meeting 9/20/2023
BOT Meeting 9/6/2023
BOT Meeting 8/16/2023
BOT Meeting 8/2/2023
BOT Meeting 7/19/2023
BOT Meeting 6/21/2023
BOT Meeting 6/07/2023
BOT Meeting 5/17/2023
BOT Meeting 5/3/2023
BOT Meeting 4/19/2023
BOT Meeting 4/5/2023
BOT Meeting 3/1/2023
BOT Meeting 2/15/2023
BOT Meeting 2/01/2023

 

BOT Meeting 12/21/22
BOT Meeting 12/7/22
BOT Meeting 11/16/22
BOT Meeting 11/2/22

Project Awards

BOT Meeting 10/19/22

Project Awards

BOT Meeting 10/5/22

Project Awards

BOT Meeting 9/21/22

Project Awards

BOT Meeting 9/7/22

Project Awards

BOT Meeting 8/17/22

Project Awards

BOT Meeting 8/3/22

Project Awards

BOT Meeting 7/20/22

Project Awards

BOT Meeting 6/15/22

Project Awards

BOT Meeting 6/1/22

Project Awards

BOT Meeting 5/18/22

Project Awards

BOT Meeting 5/4/22

Project Awards

BOT Meeting 4/20/22

Project Awards

  • Contract Award for Lister Construction, Inc. for Construction Services for the Aeronautics Nut Tree Facility Improvements Project
BOT Meeting 4/6/22

Project Awards

  • Contract Amendment #6 for Kitchell Capital Expenditure Managers, Inc. for Program Management Services
BOT Meeting 3/16/22

Project Awards

  • No Projects Awarded
BOT Meeting 3/2/22

Project Awards

  • Change Order #19 for BHM Construction for Construction Services for the Library and Learning Resource Center Project (Building 100 Replacement)
  • Contract Amendment #1 for PMP Environmental Consulting, Inc. for Professional Services for the Library and Learning Resource Center Project (Building 100 Replacement)
  • Contract Amendment #3 for Noll & Tam Architects for Professional Services for the Library and Learning Resource Center Project (Building 100 Replacement)
  • Contract for Salas O'Brien for Professional Services for the Fairfield Campus Central Plant Replacement Project
  • Contract for Salas O'Brien for Professional Services for the Fairfield Campus Replacement Substations #3 and #4 Project
BOT Meeting 2/17/22

Project Awards

  • Change Order #1 for Development Group, Inc. for Information Technology Equipment and Implementation for the Library and Learning Resource Center Project (Building 100 Replacement)
BOT Meeting 2/2/22

Project Awards

  • Contract Amendment #2 for Optima Inspections, Inc. for Professional Services for the Library Learning Resource Center Project (Building 100 Replacement)
  • Contract Award for Lovgren & Associates for Added Services for the Library Learning Resource Center Project (Building 100 Replacement)
BOT Meeting 1/19/22

Project Awards

  • Measure Q Bond Project Initiation - IT Infrastructure Improvements Project - Phase 4
  • Measure Q Bond Project Initiation - Small Capital Projects - Phase 4
  • Measure Q Bond Project Initiation - Vacaville Annex Cares Act Upgrade Project
  • Surplus Furniture for the Library Learning Resource Center Project (Building 100 Replacement)

BOT Meeting 12/15/21

Project Awards

BOT Meeting 12/1/21

Project Awards

BOT Meeting 11/18/21

Project Awards

BOT Meeting 11/3/21

Project Awards

BOT Meeting 10/20/21

Project Awards

BOT Meeting 10/6/21

Project Awards

BOT Meeting 9/1/21

Project Awards

BOT Meeting 8/18/21

Project Awards

BOT Meeting 7/21/21

Project Awards

BOT Meeting 6/16/21

Project Awards

BOT Meeting 6/2/21

Project Awards

BOT Meeting 5/19/21

Project Awards

BOT Meeting 5/5/21

Project Awards

BOT Meeting 4/21/21

Project Awards

BOT Meeting 4/7/21

Project Awards

BOT Meeting 3/17/21

Project Awards

  • No Projects Awarded
BOT Meeting 3/3/21

Project Awards

BOT Meeting 2/17/21

Project Awards

BOT Meeting 2/3/21

Project Awards

  • No Projects Awarded
BOT Meeting 1/20/21

Project Awards

BOT Meeting 12/16/20

Project Awards

  • No Projects Awarded
BOT Meeting 12/2/20

Project Awards

  • No Projects Awarded
BOT Meeting 11/18/20

Project Awards

BOT Meeting 10/21/20

Project Awards

BOT Meeting 10/7/20

Project Awards

BOT Meeting 9/16/20

Project Awards

BOT Meeting 9/2/20

Project Awards

BOT Meeting 8/19/20

Project Awards

BOT Meeting 8/5/20

Project Awards

BOT Meeting 7/15/20

Project Awards

BOT Meeting 6/17/20

Project Awards

BOT Meeting 6/3/20

 Project Awards

BOT Meeting 5/20/20

 Project Awards

BOT Meeting 5/6/20

 Project Awards

BOT Meeting 4/15/20

 Project Awards

BOT Meeting 4/1/20

 Project Awards

BOT Meeting 3/18/20

 Project Awards

BOT Meeting 3/4/20

Project Awards

BOT Meeting 2/19/20

 Project Awards

BOT Meeting 2/5/20

 Project Awards

BOT Meeting 1/15/20

 Project Awards

BOT Meeting 12/18/19

Project Awards

BOT Meeting 12/4/19

 Project Awards

BOT Meeting 11/20/19 

 Project Awards

BOT Meeting 11/6/19 

 Project Awards

BOT Meeting 10/16/19

 Project Awards

BOT Meeting 10/2/19

 Project Awards

BOT Meeting 9/18/19

Project Awards

BOT Meeting 9/4/19

 Project Awards

BOT Meeting 8/7/19

 Project Awards

BOT Meeting 7/17/19 

 Project Awards

BOT Meeting 6/19/19

 Project Awards

  • Approval of Five Year Construction Plan
  • Contract Award to First Carbon Solutions for Professional Services for the Library/Learning Resource Center Project (Building 100 Replacement)
  • Contract Award to CSW/ST2 for Professional Services for the Aeronautics Nut Tree Facility Improvements Project
  • Contract Award to Swinerton Management and Consulting for the Library/Learning Resource Center Project (Building 100 Replacement)
BOT Meeting 6/5/19

Project Awards

  • Resolution No. 18-19/23: Change Order #1 to Clear Blue Energy Corporation for the Building Lighting Upgrade Project
  • Contract Award to HMR Architects for Professional Services for the Building 300 Modifications; Mailroom and Graphics Project
  • Contract Award (Surety Takeover Agreement) to Fidelity and Deposit Company of Maryland for Construction Services for the Horticulture Modular Restroom Building Project
  • Approval of Division of State Architect (DSA) Inspection Services Pool of Firms
  • Approval of Material Testing and Special Inspections Services Pool of Firms
BOT Meeting 5/15/19

Project Awards

  • Contract Amendment #2 for Visions Management for Professional Services for the Science Building Project
  • Approval of Contractor Prequalification Process for Construction Services for the Library Learning Resource Center Project (Building 100 Replacement)
BOT Meeting 5/1/19 

 Project Awards

BOT Meeting 4/17/19

Project Awards

BOT Meeting 4/3/19

Project Awards

BOT Meeting 3/6/19

 Project Awards

BOT Meeting 2/20/19

Project Awards

BOT Meeting 2/6/19

 Project Awards

BOT Meeting 1/16/19 

 Project Awards

BOT Meeting 12/20/18 

 Project Awards

BOT Meeting 12/5/18

 Project Awards

BOT Meeting 11/20/18 

 Project Awards

BOT Meeting 11/7/18 

 Project Awards

BOT Meeting 10/17/18

 Project Awards

BOT Meeting 10/3/18

 Project Awards

BOT Meeting 09/19/18

 Project Awards

BOT Meeting 09/05/18

Project Awards

BOT Meeting 08/15/18

 Project Awards

BOT Meeting 08/01/18

 Project Awards

BOT Meeting 07/18/18 

 Project Awards

BOT Meeting 06/20/18 

 Project Awards

BOT Meeting 06/06/18

 Project Awards

BOT Meeting 05/16/18

 Project Awards

BOT Meeting 05/02/2018

 Project Awards

BOT Meeting 04/18/2018

 Project Awards

BOT Meeting 04/04/2018

Project Awards

BOT Meeting 03/21/2018

Project Awards

BOT Meeting 03/07/2018

Project Awards

BOT Meeting 02/21/2018

Project Awards

BOT Meeting 02/7/2018

Project Awards

BOT Meeting 01/17/2018

Project Awards

BOT Meeting 12/20/2017

Project Awards

BOT Meeting 12/06/2017

Project Awards

BOT Meeting 11/15/2017

Project Awards

BOT Meeting 11/01/2017

Project Awards

BOT Meeting 10/18/2017

Project Awards

BOT Meeting 10/04/2017

Project Awards

BOT Meeting 09/20/2017

Project Awards

BOT Meeting 09/06/2017

Project Awards

BOT Meeting 08/16/2017

Project Awards

BOT Meeting 08/02/2017

Project Awards

BOT Meeting 07/19/2017

Project Awards

BOT Meeting 06/21/2017

Project Awards

BOT Meeting 06/07/2017

Project Awards

BOT Meeting 05/17/2017

Project Awards

BOT Meeting 05/03/2017

Project Awards

BOT Meeting 04/19/2017

Project Awards

BOT Meeting 04/05/2017

Project Awards

BOT Meeting 03/15/2017

Project Awards

BOT Meeting 03/01/2017

Project Awards

BOT Meeting 02/15/2017

Project Awards

BOT Meeting 02/01/2017

Project Awards

BOT Meeting 01/18/2017

Project Awards

BOT Meeting 12/21/2016

Project Awards

BOT Meeting 11/16/2016

Project Awards

BOT Meeting 11/02/2016

 Project Awards

  • Public Improvement Agreement with City of Vacaville for Intersection Improvements at Vacaville Center Entry Drive at North Village Parkway
BOT Meeting 10/19/2016

Project Awards

  • Lease agreement extensions to William Scotsman Inc., for Modular Buildings
  • Contract Change Order #6 to BHM Construction Inc., for Building 1200 Performing Arts Renovation (Phase 1) Project
  • Resolution to Approve Change Order #01 to Prime Mechanical for Pool Room Heat Exchangers Replacement Project, Resolution No. 16/17-07
  • Measure Q Bond Spending Plan Update #3
BOT Meeting 10/05/2016

Project Awards

  • Contract Change Order #5 to BHM Construction Inc., For Building 1200 Performing Arts Renovation (Phase 1) Project
  • Contract Amendment#1 with Construction Testing Services, Inc. for Vacaville Classroom Building Renovation Project
BOT Meeting 09/21/2016

 Project Awards

  • Contract Award to CSW/Stuber-Stroeh Engineering Group Inc. for Engineering Services for the Campus Entry Sidewalk Improvements Project
  • Contract Award to CA Architects for Architectural and Engineering Services for the Performing Arts Costume Workshop and Classroom Project
  • Contract Amendment #1 with CA Architects for Architectural and Engineering Services for Vacaville Classroom Building Project
  • Contract Amendment #3 with LPAS for Building 1200 Theater Renovation Project
  • Change Order #1 to Integrity Data & Fiber for the Districtwide Information Technology Infrastructure Improvements Project and Building 1200 Performing Arts Renovation (Phase) Project
  • Contract Change Order #4 to BHM Construction Inc for Building 1200 Performing Arts Renovation
  • Change Order - No. 01 (Deductive) to Arthulia, Inc. for Site Lighting Improvements Project
  • Change Order - No. 01 (Deductive) to TPA Construction, Inc. for Measure Q Thank You Signs Project
  • Resolution to Approve Change Order #2 to TPA Construction for B100 Academic Success Center and Tutoring Expansion Project, Resolution No. 16/17-06 
BOT Meeting 08/17/2016

Project Awards

  • Contract Award for Construction Services to TPA Construction, Inc. for Building 100 Lobby Furniture and Electrical Improvements Project
  • Amendment #1 with County of Solano for Aeronautics & Workforce Development Building Project
  • Contract Amendment #1 with Hazard Management Services for Professional Services for the Asbestos Abatement Project
  • Contract Change Order #1 to Clark/Sullivan Construction for Autotechnology Project
  • Contract Change Order #1 to Lister Construction for the Water Line Shut Off Valves Project
  • Change Order No. 01 to Quality Painting & Construction for the Vallejo Center Exterior Painting Project
BOT Meeting 07/20/2016

  Project Awards

  • Change Order - No. 01 to Cooper Oates Air Conditioning for Hydronic Pumps Replacement Project
  • Change Order -No. 01 to Quality Sound for Fire Alarm Control Panels Upgrade Project
  • Change Order -No. 03 to Southwest Construction for Buildings 1600, 1800A, and 1900 Re-Roofing Project
  • Change Order -No. 03 to BHM Construction Inc. for Building 1200 Performing Arts Renovation (Phase I) Project
  • Contract Award to CA Architects for Architectural and Engineering Services for the Softball Field Bleacher Replacement Project
  • Contract Award to JRDV Architects Inc. for Architectural Site Master Planning Services for the Aeronautics and Workforce Development Building Project
  • Contract Award for Construction Services to Pro Builders for the Horticulture Site Improvements Projects
  • Contract Award to Trinity EMCS Inc. to Perform Retro-Commissioning Services for the HVAC/EMS Efficiency Project
BOT Meeting 06/15/2016

 Project Awards

  • Change Order - No. 02 (Deductive) to Southwest Construction for Buildings 1600, 1800A, and 1900 Re-Roofing Project
  • Contract Amendment #1 with Development Group Inc. For Professional Services for the B100 Academic Success Center and Tutoring Expansion Project
  • Contract Amendment #1 with Dovetail for Consulting Services for the Furniture Replacement Project
  • Contract Amendment #1 for MADI Architecture for Design Services for the Horticulture Site Improvements Project
  • Contract Award for Construction Services to Arthulia, Inc. for 21st Century Classrooms - Phase 2 Project
  • Contract Award to Dell Marketing L.P. for Professional Services for 21st Century Classroom - Phase 2 Project
  • Contract Award to MADI Architects for Professional Services for B100 Lobby Lighting & Electrical Improvements Project
  • Contract Award to Omni-Means Ltd. for Professional Services for Vacaville Center Intersection Improvements Project
  • Contract Award to Utelogy Corporation for Professional Services for 21st Century Classroom - Phase 2 Project
  • Contract Award to JK Architecture Engineering for Professional Services for Aeronautics and Workforce Development Project
BOT Meeting 05/18/2016

Project Awards

  • Contract Award to Visions Management for Professional Services for Performing Arts Building Swing Space Project and Program Management
  • Contract Award for Professional Commissioning Authority Services to Glumac for the Autotechnology Building ProjectContract
  • Change Order #2 to BHM Construction Inc. for Building 1200 Performing Arts Renovation (Phase I) Project
  • Contract Award for Project Inspector Services to Optima Inspections Inc. for Horticulture Site Improvements Project
  • Contract Award to Construction Testing Services Inc. (CTS) for Special Inspection and Testing Services for the for Horticulture Site Improvements Project
  • Approval of Mitigated Negative Declaration (MND) for Science Building Project, Fairfield, California
    Contract Award to Calvary Construction for Construction Services for the Asbestos Abatement Project
  • Contract Award to Hazard Management Services for Professional Services for Asbestos Abatement Project
  • Contract Award to GeoTech Utility Locating for Professional Services for Water Line Shut Off Valves Project
  • Contract Award to Lister Construction for Construction Services for the Water Line Shut Off Valves Project
  • Contract Amendment #1 with Dovetail for Furniture, Fixtures and Equipment Consulting Services for the B100 Academic Success Center and Tutoring Expansion Project
  • Contract Award to Crown Worldwide Moving and Storage for Professional Services for B100 Academic Success Center and Tutoring Expansion Project
  • Contract Award to MADI Architects for Professional Services for 21st Century Classroom - Phase 2 Project
BOT Meeting 05/04/2016

  Project Awards

  • Contract Award to Kitchell CEM Inc. Professional Services for Vallejo Center Exterior Paint Project
  • Contract Award to Quality Painting & Construction, Inc. for Constructions Services for the Vallejo Center Exterior Painting Project
BOT Meeting 04/20/2016

 Project Awards

  • Contract Amendment No. 6 with Kitchell CEM Inc. for Construction Management Services
  • Contract Award to Prime Mechanical for Construction Services for Pool Pump Room Heat Exchangers Replacement Project
  • Contract Award to QualitySound for Construction Services for Fire Alarm Control Panels Upgrade Project
  • Contract Amendment to CSW/Stuber-Stroeh Engineering Group, Inc., for Civil Engineering Services for the Fairfield Campus Agriculture (Horticulture) Project
  • Contract Amendment #1 with Wallace Kuhl & Associates for Geotechnical Services for the Vacaville Workforce Development and Aeronautics Building Project
  • Contract Amendment #1 with CA Architects for Architectural Services for Site Lighting Improvements Project
  • Contract Award for Construction Services to Arthulia, Inc. for the Site Lighting Improvements Project and Small Capital Project
  • Contract Award to Optima Inspections Inc., for Project Inspection Services for Site Lighting Improvements Project
  • Contract Award to Guidepost for Professional Services for Security Camera System Planning Project
  • Contract Amendment #1 with Lionakis for Architectural Services for the Fairfield New Science Building Project
  • Contract Award for Construction Services to Cavalry Construction, Inc. for the Building 1300 Kiln Fence Project
  • Contract Award to Optima Inspections Inc. for Project Inspection Services for Building 1300 Kiln Fence Project
  • Contract Award for Construction Services to The Boldt Company for the Building 200 Kitchen Renovation Project
  • Contract Award for Inspector of Record Services to Optima Inspections Inc. for the Building 200 Kitchen Renovation Project
  • Contract Award for Construction Services to TPA Construction for the Building 100 Academic Success and Tutoring Expansion Project
  • Contract Award for Project Inspection Services to Optima Inspections Inc. for the Building 100 Academic Success and Tutoring Expansion Project
  • Contract Award for Professional Commissioning Authority Services to Engineering Economics Inc. for the Vacaville Biotechnology Project
  • Contract Award for Professional Commissioning Authority Services to Glumac for the Building 1200 Performing Arts Renovation (Phase 1) Project
  • Contract Award for Professional Engineering Services to EDesignC Incorporated for the Vacaville and Vallejo Centers HVAC Improvements and Upgrades Project
  • Contract Award to Pavement Engineering Inc. for Professional Services for Pavement Assessment Project
  • Contract Award for Construction Services to TPA Construction for the Measure Q Thank You Signs Project
  • Contract Award to Utelogy Corporation for Professional Services for Districtwide IT Infrastructure Improvements Project
BOT Meeting 04/06/2016

Project Awards

  • Contract Award to UndergroundGIS, Inc. for Profession Services for Underground Utility Data Management for Measure Q Program
BOT Meeting 03/16/2016

Project Awards

  • Contract Award to Cooper Oates Air Conditioning for Construction Services for Hydronic Pumps Replacement at Fairfield Project
  • Contract Award to Construction Testing Services Inc. (CTS), for Project Special Inspection and Testing Services for the Science and Biotechnology Building Project
  • Contract Award to Junk Pros for Professional Services for Disposal of Surplus FF&E Project
  • Contract Award to Swinerton Management and Consulting for Construction Management Services for Science Building Phase I Project
BOT Meeting 02/17/2016

 Project Awards

  • Contract Amendment with LPAS for Building 1200 Theater Renovation Project Architectural Services
  • Contract Award to Crown Worldwide Moving and Storage for Professional Services for Furniture Move 360 Campus Lane Project
  • Contract Award to Ninyo & Moore for Project Special Inspection and Testing Services for the Automotive Technology Building Project
  • Contract Award to Dovetail for Consulting Services for the Furniture Replacement Project
  • Contract Award to Hazard Management Services, Inc. for Professional Services for Asbestos Abatement Project
  • Contract Award to tBP Architecture for Professional Services for B1400 Food Service Area Assessment
  • Contract Award to TYR, Inc. for Project Inspection Services for the Automotive Technology Building Project
  • Purchase Order to Integrity Data and Fiber, Inc. for Cabling for Building 100 Academic Success Center and Tutoring
  • Purchase Order to JLC Contracting, Inc. for Electrical Outlets for Building 100 Academic Success Center and Tutoring
BOT Meeting 01/20/2016

Project Awards

  • Contract award to Commercial Design Inc. for Construction Services for B1300 Counter Top Replacement Project
  • Contract Award to Premier Chemical Environmental Solutions for Consulting Services for B1200 Renovation Swing Space Project
  • Contract Award to CA Architects for Professional Services for Utility Infrastructure Upgrade – Fairfield Substation 1 and 2 Replacement Project
  • Contract Award to CA Architects for Professional Services for Utility Infrastructure Upgrade – Fairfield Exterior Lighting Project

BOT Meeting 12/16/2015

 Project Awards

  • Contract Amendment to Dovetail for Furniture, Fixtures and Equipment Consulting Serives for the Biotechnology and Science Building Project
  • Contract Amendment with Strata Information Group for Consulting Services for the Information Technology Infrastructure Improvements Project
  • Contract Award to Dovetail for Furniture, Fixtures and Equipment Consulting Services for the B100 Academic Success Center Expansion Project
  • Contract Award to Kate Keating Associates, Inc. for Graphic Design Services for Interior Signage Standards Project
  • Contract Award to Premier Chemical & Environmental Solutions for Biotechnology Project Consulting Services
  • Contract Award to Madi Architects for Architectural Services for B100 Academic Success Center Expansion Project
  • Contract Award to Optima Inspections, Inc., for Project Inspection Services for the Biotechnology and Science Building Project
  • Contract Award to TPA Construction, Inc. for Construction Services for B1200 Renovation Swing Space Project
  • Contract Award to Wallace Kuhl & Associates, for Geotechnical Services for the VAcaville Workforce Development and Aeronautics Building Project
BOT Meeting 11/19/2015

Project Awards

  • Contract Amendment to CA Architects for Architectural and Engineering Services
  • Contract Amendment to CSW/Stuber-Stroeh Engineering Group, Inc., for Civil Engineering Services for the Fairfield Campus Agriculture (Horticulture) Project
  • Purchase Order to WeidnerCA for Wayfinding Signage for Building 600
  • Contract Amendment to Dovetail for Program Level Furniture, Fixtures and Equipment Consulting Services
  • Contract Award to Optima Inspections, Inc. for Project Inspection Services
  • Contract Award to Cornerstone Technologies LLC, for Vallejo VDI Deployment Services for the Information Technology Infrastructure Improvements Project
  • Contract Award to Decorator Draperies for Construction Services
  • Contract Award to All Clear Inc. For Construction Services for Horticulture Site Tree Removal Project
  • Contract Award to CA Architects for Architectural Services for CDFS Kitchen Renovation Project
BOT Meeting 10/21/2015

Project Awards

  • Contract Amendment with CA Architects for Architectural Services for Performing Arts Building (B1200 Renovation) Swing Space Project
  • Contract Award to Berger Steel Corporation for Construction of Building 1300 Kiln Project
  • Contract Award to Consolidated Engineering Laboratories for Special Inspection Services for Building 1300 Kiln Project
  • Contract Award to Optima Inspections, Inc., for Project Inspection Services of Building 1300 Kiln Project
  • Contract Award to Decorator Draperies for Construction Services for CDFS Building Window Shades and Limited Kitchen Renovation Project
  • Contract Award to Dovetail for Furniture, Fixtures and Equipment Consulting Services for the Biotechnology and Science Project
  • Award to OmniUpdate for Professional Services for Measure Q Website Communications
  • Contract Award to Optima Inspections. Inc., for Project Inspection Services of Building 1600, 1800-A and 1900 Re-Roofing Project
  • Contract Award for Construction Services to Southwest Construction and Property Management Corporation for the Buildings 1600, 1800-A and 1900 Re-Roofing Project
  • Contract Award to Terracon Consultants, Inc., for Geotechnical Services for the Horticulture Project
  • Contract Award for Construction Services to TPA Construction, Inc., for Small Capital-Technology Classrooms Building 800 Project
BOT Meeting 10/07/2015

Project Awards

  • Contract Award to Clark and Sullivan Construction Inc., for the Design and Construction of the Automotive Technology Building Project
BOT Meeting 09/16/2015

 Project Awards

  • Contract Amendment with Dannis Woliver Kelley (DWK), Legal Services and Construction Attorneys for Measure G and Measure Q Bonds
  • Contract Award to BHM Construction Inc. for Building 1200 Performing Arts Renovation (Phase I) Project
  • Contract Award to First Carbon Solutions for California Environment Quality Act (CEQA) Services for the Science Building (Phase I) Project
BOT Meeting 09/02/2015

Project Awards

  • Contract Award to CA Architects for Architectural and Engineering Services for the Vacaville Classroom Building Project
  • Contract Award to Integrity Data & Fiber Inc., for Network Cabling Services for the Districtwide Information Technology Infrastructure Improvements Project
BOT Meeting 08/19/2015

 Project Awards

  • Contract Award to Development Group Inc., for Professional Services for the Districtwide Information Technology Infrastructure Improvements Project
  • Contract Award to Optima Inspections Incorporated for DSA Project Inspection Services for the Vacaville Classroom Building Renovation
  • Contract Award to Construction Testing Services, Inc. for DSA Special Inspection Services for the Vacaville Classroom Building Renovation Project
  • Contract Award to JLC Contracting Inc., for Electrical Construction Services for Small Capital Projects - Portable Classrooms Phase II, Exterior Lighting
  • Contract Amendment to Kitchell Capital Expenditure Managers for Program and Design Management Services for the Science Building Project
  • Contract Award to Best Instrument Repair for B1200 Performing Arts (Phase I Renovation) Specialty Equipment Assessment Services
  • Districtwide Tree Removal Plan
BOT Meeting 08/05/2015

 Project Awards

  • Contract Award to Rudolph & Sletten for the Design and Construction of the Biotechnology and Science Building ProjectR&S Design Build Contract Attachment I
    • R&S Design Build Contract EXHIBIT F1
    • R&S Design Build Contract EXHIBIT F2
    • R&S Design Build Contract EXHIBIT G
    • R&S Design Build Contract Exhibit
  • Contract Award to Aquatic Design Group Inc. for Architectural and Engineering Services for the Swimming Pool Deck Improvement Project
  • Contract Award to IDF for Construction Services for Small Capital Projects: B1600 Classroom Improvements and Portable Classrooms Phase II Improvement Project
  • Contract Award to JLC Contracting, Inc., for Construction Services for the Performing Arts Building (B1200 Renovation) Swing Space Project
  • Contract Award to IDF for Construction Services for Small Capital Projects: Building 1800 Classroom Improvements and Technology Classroom Projects
  • Contract Award to JLC Contracting, Inc., for Electrical Construction Services for the Performing Arts Building (B1200 Renovation) Swing Space and Technology Classroom Projects
  • Contract Amendment to ED2 International for Design - Build Review Services for the Vacaville Biotechnology & Science Project
  • Contract Award to Omni - Means LTD for Traffic Engineering Services for the Vacaville Classroom Building Renovation Project
  • Districtwide Tree Removal Plan
BOT Meeting 07/15/2015

 Project Awards

  • Contract Amendment to Utelogy for Professional Services for Small Capital Projects: Building 1600 Classroom Improvements and Portable Classrooms (Phase II)
  • Contract Amendment to Swinerton Management and Consulting for Construction Management Services for the Automotive Technology Project
  • Contract Amendment to Swinerton Management and Consulting for Construction Management Services for the Biotechnology and Science Building Project
  • Contract Award to JLC Contracting, Inc., for Construction Services for Small Capital Projects - Portable Classrooms (Phase II)
  • Contract Award to MADI Architects for Architectural and Engineering Services for the Agriculture (Horticulture) Project
  • Contract Award to JLC Contracting, Inc., for Electrical Services for Small Capital Projects - Building 1800 Classroom Improvements Project
  • Contract Award to Lionakis for Architectural and Engineering Assessment Services for Small Capital Projects – Building 300 Feasibility Study
  • Contract Award to CA Architects for Architectural and Engineering Services for Building 1300 Kiln Design Project
  • Contract Award to Wallace Kuhl & Associates for Geotechnical Services for the Science Building (Phase I) Project
  • Contract Award to Decorator Draperies for Construction Services for Small Capital Projects: Technology Classrooms Implementation and Building 1800 Classroom Improvements Project
  • Contract Award to Sac Valley Electric for Construction Services for Small Capital Projects - Portable Classrooms (Phase II)
  • Contract Award to Development Group Inc., for Professional Services for the Districtwide IT Infrastructure Improvements Project
BOT Meeting 06/17/2015

Project Awards

  • Contract Amendment to MADI Architects for Architectural Services for Building 1600 Roof Replacement Project
  • Contract Amendment to Visions Management for Move Management Services for Building 1200 Performing Arts Renovation (Phase 1) Swing Space Project
  • Contract Award to Dovetail for Furniture, Fixtures and Equipment Consulting Services for the Autotechnology Building Project
  • Contract Award to Consolidated Engineering Laboratories for DSA Special Inspection Services for Building 1200 Performing Arts Renovation (Phase 1) and Swing Space Project
  • Contract Award to the Shalleck Collaborative Inc., for Equipment Consulting Services for Building 1200 Performing Arts Renovation (Phase 1) Project
  • Contract Award to CA Architects for Architectural and Engineering Services for Small Capital Projects – Portable Classrooms Phase II and Building 1800 Classroom
  • Contract Award to Gilbane for Construction Management Services for the Science Building Project (Phase I)
BOT Meeting 06/03/2015

Project Awards

  • Contract Award to Utelogy Corporation for Professional Services for the Portable Classrooms Phase II – Small Capital Project
  • Contract Award to Wall 2 Wall Painting for Construction Services for the Biotechnology and Science Building Classroom Improvement
  • Contract Award to Tyrell Plumbing for Construction Services for the Biotechnology and Science Building Classroom Improvement Project
  • Contract Award to Sac Valley Electric, Inc., for Construction Services for the Biotechnology and Science Building Classroom Improvement Project
  • Contract Award to Sac Valley Electric Inc., for Fire Alarm Installation for the Portable Classrooms Phase II – Small Capital Project
  • Contract Award to JLC Contracting, Inc., for Building 1200 Performing Arts Renovation (Phase I) Swing Space Project
  • Contract Award to Gilbane for Construction Management Services for the Science Building Project (Phase I)
BOT Meeting 05/20/2015

 Project Awards

  • Contract Amendment to Dovetail for Program Level Furniture, Fixtures and Equipment Consulting Services
  • Contract Amendment to Lionakis for Architectural Services for the Autotechnology Building Project in Vallejo
  • Contract Award to Gilbane for Construction Management Services for the Science Building Project (Phase 1)
  • Contract Award to Sac Valley Electric for Fire Alarm Installation for Building 1200 Performing Arts Renovation (Phase 1) Swing Space and Small Capital Projects
  • Contract Award to Optima Inspection Inc., for DSA Project Inspector Services for Building 1200 Performing Arts Renovation (Phase 1) and Swing Space Projects
  • Contract Award to Verde Design for Fairfield Campus Facilities Master Planning Services
  • Contract Amendment to Scheer Intelligence for Consulting Education Master Plan Services for the Vacaville Nut Tree Airport
BOT Meeting 05/06/2015

Project Awards

  • Contract Award to Corovan Moving Company Inc., for Building 1200 Performing Arts Building Renovation Swing Space and Utility Infrastructure Upgrade (Energy Projects)
  • Contract Award to Geotech for Utility Locating Services for Building 1000 Horticulture Project
  • Contract Award to Integrity Data & Fiber for Building 1200 Performing Arts Renovation (Phase 1) Swing Space and Small Capital Projects
  • Contract Award JLC Contracting, Inc., Building 1200 Performing Arts Renovation (Phase 1) Swing Space and Small Capital Projects
  • Contract Award to MADI Architects for Architectural Services for the Small Capital Project
  • Contract Award to Sac Valley Electric for Electrical Services for Building 1200 Performing Arts Renovation (Phase 1) Swing Space and Small Capital Projects
BOT Meeting 04/15/2015

 Project Awards

  • Contract Award to Visions Management for Move Management & Coordination Services for the Performning Arts Building (Building 1200 Renovation) Swing Space & Utility Infrastructure Upgrade (HVAC/EMS) Projects
  • Contract Award to FirstCarbon Solutions for California Environmental Quality Act (CEQA) Services for the Vallejo Campus
  • Notice of Completion for Hazardous Materials Abatement of Building 1100 Portables, for the Performing Arts Building (B1200 Renovations) Swing Space Project
  • Lease Agreement Approval to Williams Scotsman Inc., for DSA Pre-Approved Modular Classrooms for the Performing Arts Building Swing Space Project & Small Capital Improvement Projects
  • Measure G Bond Spending Plan & Close-Out Plan
BOT Meeting 03/18/2015

 Project Awards

  • Contract Award to Madi Architects for Architectural Services for Buildings 1800A and 1900 Roof Replacement Project
  • Contract Award to J.R. Wagner, Inc., for Pressure and Fire Flow Readings Consulting Services for Vacaville Classroom Building
  • Contract Award to CA Architects for Architectural Services for Performing Arts Building (B1200 Renovation) Swing Space Project
  • Contract Award to PAE Consulting Engineering Inc., for Consulting Services for Small Capital Projects – Building 100 Data Center
  • Notice of Completion for Vacaville and Vallejo Centers Building ID Signage Project
  • Contract Amendment to Joseph Gumina for Equipment Planning Services for Vallejo Autotechnology Swing Space Project
  • Contract Amendment to Henley Architects & Associates for Architectural Services for Building 600 (Administration) Renovation Project
  • Contract Amendment to Matriscope Engineering Laboratories, Inc., for Special Inspections and Lab Testing Services for Building 600 (Administration) Renovation Project
  • Contract Award to Dovetail for Furniture, Fixtures, and Equipment Consulting Services for the Biotechnology and Science Building Project
  • Contract Award to Maintenance Design Group for Consulting Services for the Autotechnology Building Project
  • Measure Q Equity Inclusion and Outreach Guidelines for Contractors
  • Citizens Bond Oversight Committee CBOC Annual Report to the Governing Board
  • Change Orders No 01 Deductive to Mike Brown Electric and No 04 to Sunpower
BOT Meeting 02/18/2015

 Project Awards

  • Contract Award to CSW/Stuber - Stroeh Engineering Group, Inc., for Civil Engineering Services for the Biotechnology and Science Project
  • Contract Award to CA Architects for Professional Services for Building 1300 Kiln Assessment
  • Contract Award to CSW/Stuber - Stroeh Engineering Group, Inc. for Civil Engineering Services for the Fairfield Agriculture (Horticulture) Project
  • Contract Award to Decorator Draperies for Blinds Installation for Building 600 Project and Classroom Upgrades - Building 1400 Project
  • Contract Award to Corovan Moving and Storage Company for Performing Arts Building (Building 1200 Renovation) Swing Space Project
  • Contract Award to Scheer Intelligence for Consulting Education Master Plan Services for Vacaville Nut Tree Airport
  • Contract Award to Utelogy Corporation for Professional Services for District - Wide Information Technology Infrastructure Improvements Project
  • Measure Q Bond Spending Plan Update
BOT Meeting 01/21/2015

 Project Awards

  • Contract Award to Professional Asbestos and Lead Services, Inc., for Hazardous Materials Abatement for the Performing Arts Building (B1200) Renovation, Swing Space Project
  • Contract Award to CA Architects for Professional Services for Vacaville Classroom Building Project
  • Contract Award to CSW/Stuber - Stroeh Engineering Group, Inc., for Civil Engineering Services for Utility Infrastructure Upgrades, Vallejo Belvedere Site Utility Mappin
  • Contract Award to RGA Environmental for Hazardous Materials Consulting Services for the Performing Arts Building (B1200) Renovation, Swing Space Project
  • Contract Award to A Plus Tree, Inc., for Professional Services for A Districtwide Tree Assessment
  • Contract Award to JLC Contracting Inc., for Vallejo Autotech Building Swing Space Project
  • Contract Award to Sac Valley Electric for Lighting Design and Installation for the Utility Infrastructure Upgrade Project

BOT Meeting 12/17/2014

 Project Awards

  • Contract Award to Lionakis for Architectural Services for Science Building Project Phase I
  • Contract Award to Lionakis for Architectural Services for Science Building Project Phase I - Exhibit A
  • Contract Award to Lionakis for Architectural Services for Science Building Project Phase I - Exhibit BCDEFGH
  • Contract Award to Dovetail for Program Level Furniture, Fixtures and Equipment Consulting Services
BOT Meeting 12/03/2014
  •  Citizens Bond Oversight Committee (CBOC) Measure Q Quarterly Progress Update
BOT Meeting 11/19/2014

 Project Awards

  • Contract Award to Swinerton Management and Consulting for Construction Management Services for the Auto Technology Project
  • Contract Award to Swinerton Management and Consulting for Construction Management Services for the Auto Technology Project - Exhibit A
  • Contract Award to Swinerton Management and Consulting for Construction Management Services for Biotechnology Project
  • Contract Award to Swinerton Management and Consulting for Construction Management Services for Biotechnology Project - Exhibit A
  • Contract Award to WeidnerCA for Vacaville and Vallejo Centers Building Identification Project
  • Contract Award to Communication Strategies for Technology Design Services for Districtwide Information Technology Infrastructure Project
  • Bid Award to Professional Asbestos and Lead Services Inc., for the Utility Infrastructure Upgrade - HVAC/EMS Efficiency Project
  • Contract Award to Crown Worldwide Moving and Storage for Moving Services for the Administration Building Renovation (Building 600) Project
  • Contract Award to Optima Inspections Inc., for Project Inspector Services for the Utility Infrastructure Upgrade - HVAC/EMS Efficiency Project

Contract Amendments

  • Contract Amendment with Miyamoto International for Professional Services for Vacaville Annex Classroom Building Project
BOT Meeting 11/05/2014

Project Awards

  • Contract Award to Kitchell CEM for Measure Q Program and Design Management
  • Contract Award to Kitchell CEM for Measure Q Program and Design Management - Exhibit A
BOT Meeting 10/15/2014

Project Awards

  • Contract Award to ED2 International for Architectural Services for Biotechnology and Science Project
  • Contract Award to Lionakis for Architectural Services for Autotechnology Project
  • Award to Eadoc LLC forMeasure Q Consulting Services
  • Award to HRA Consulting Engineers for Electrical Engineering Services for Biotechnology & Science Swing Space Project
  • Award to Kitchell CEM for Program and Design Management Services - Exhibit D (Fee Proposal)
  • Award to Kitchell CEM for Program and Design Management Services - Exhibits A-D
  • Award to Kitchell CEM for Program and Design Management Services
  • Award to JLC Contracting for Small Capital Projects - Vacaville Center Furniture Anchorage Project
  • Award to Premier Chemical Environmental Solutions for Vacaville and Vallejo Centers
  • Award for Consultant Services to Joseph Gumina for Equipment Planning Services for Vallejo Autotechnology Swing Space Project

Contract Amendments

  • Contract Amendment with Dutra Cerro Graden
  • Amendment with Utelogy Corporation for Professional Services for District IT Infrastructure Project
BOT Meeting 09/17/2014

 Project Initiation Forms

  • Small Capital Projects
  • Performing Arts Building (Phase 1, B1200 Renovation)
  • Science Building (Phase I)
  • IT Infrastructure Improvements
  • Utility Infrastructure Upgrade (Energy)
  • VV Biotechnology & Science Building
  • VJ Autotechnology Building
  • VV Classroom Building Purchase & Renovation


Contract Amendments

  • Dannis Woliver Kelley Legal Services and Construction Attorney
BOT Meeting 09/03/2014

Contract Purchase

  • 1683 to 1699 North Ascot Parkway, Vallejo CA
BOT Meeting 08/20/2014

 Contract Amendments

  • LPAS for Bldg. 1200 Theater Renovation Project Architectural Services
  • Henley Architects & Associates for Architectural Services for B600 Admin Project

Contract Awards

  • Corovan Moving and Storage Company Inc. for Bio and Autotech Bldgs Swing Space
  • Dudek for Environmental Planning Services for Vacaville Center Site
  • Integrity Data and Fiber for Vallejo Autotech Building Project
  • Van Pelt Construction Services for Construction Management Services for B1200 Theater Renovation